Wednesday 21st October
11am - 2pm - Filming in the pheonix theatre:
- filming the cast "playing" and "singing" the first verse for performance flashback.
Thursday 29th October
9.30am - 8.20pm - Filming day in Brighton:
9.00am - meet at victoria station
9.30am - train arrive at 10.30am
11am - 11.30am - filming busking scene outside the station inc. lip syncing whole song
11.30 - 12.30pm - walking through the lanes inc. filming them walking round in the lanes and also 2 different angles of lip syncing song
12.30 - 2pm - lunch
2pm - 4pm - filming in the funfair, inc. going on rides, lip syncing infront of rollercoaster, on the games, on the dodgems, in the arcade, plus weird shots of spinning, and laods of money on the gambling machines, plus arguments with band and vita and stefan etc. (will take a long time)
4pm - 5pm - break
5pm - 6pm - band on the beach inc. drinking smoking laughing, feet in the water?, singing round with guitar
6pm - 7pm - vita and stefan on beach (on beach between 5 and 7 so depending on light etc. for what we film and when we finish)
7pm - walk back to station for 8.20 train home.
posted by Dara and Rosey
Monday, 19 October 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment